Summit Power Assemblies for the Ausgrid Energy Network have been put together using the Ausgrid Energy Construction Standards.
All items supplied in our Assemblies are from the Ausgrid Energy Approved Material List.
Summit Power Assemblies include all items necessary for building constructions on the Ausgrid Energy Network.
Our Assemblies have been developed using the Ausgrid Energy Construction Standards. Continually striving to improve our systems we have utilised feedback from workers in the field to make our assemblies most efficient and effective way of supplying hardware to contractors to meet their projects needs.
Summit Power assemblies take into consideration project specific information and are designed to include all variables such as Pole Size & Type, Conductor Type, Connections, Terminations & Circuit Information.
All items supplied in our Assemblies are from the Ausgrid Energy Approved Material List.
Summit Power Assemblies include all items necessary for building constructions on the Ausgrid Energy Network.
Our Assemblies have been developed using the Ausgrid Energy Construction Standards. Continually striving to improve our systems we have utilised feedback from workers in the field to make our assemblies most efficient and effective way of supplying hardware to contractors to meet their projects needs.
Summit Power assemblies take into consideration project specific information and are designed to include all variables such as Pole Size & Type, Conductor Type, Connections, Terminations & Circuit Information.
Construction Type |
Drawing No/Summit Ref. |
Construction Description |
---|---|---|
Const 2-201 | 520291 | 12.7kV SWER Pin Assembly |
Const 2-203 | 520292 | 12.7kV SWER Angle Assy |
Const 2-210 | 520293 | 12.7kV SWER Single Termination Assy |
Const 2-211 | 520294 | 12.7kV SWER Through Termination Assy |
Const 2-214 | 520295 | 12.7kV SWER Tee Off Assy |
Const 2-260 | 520296 | 12.7kV SWER Dolf Arrangement Assy |