Bare Low Voltage

Summit Power Assemblies for the Endeavour Energy Network have been put together using the Endeavour Energy Construction Standards.

All items supplied in our Assemblies are from the Endeavour Energy Approved Material List.

Summit Power Assemblies include all items necessary for building constructions on the Endeavour Energy Network.

Our Assemblies have been developed using the Endeavour Energy Construction Standards. Continually striving to improve our systems we have utilised feedback from workers in the field to make our assemblies most efficient and effective way of supplying hardware to contractors to meet their projects needs.

Summit Power assemblies take into consideration project specific information and are designed to include all variables such as Pole Size & Type, Conductor Type, Connections, Terminations & Circuit Information.

Endeavour Assemblies: Bare Low Voltage
Construction Type
Drawing No.
Construction Description
B01 EN332012 LV B01 Bare Pin Through Mains Assy
B02 EN332013 LV B02 Bare Through Mains Doubleย  Arm Assy
B03 EN332014 LV B03 Bare Through Strain Assy
B04 EN332015 LV B04 Bare Through Strain Double Arm Assy
B05 EN332016 LV B05 Bare Termination Assy
B06 EN332017 LV B06 Bare Termination Double Arm Assy