Summit Power Assemblies for the Endeavour Energy Network have been put together using the Endeavour Energy Construction Standards.
All items supplied in our Assemblies are from the Endeavour Energy Approved Material List.
Summit Power Assemblies include all items necessary for building constructions on the Endeavour Energy Network.
Our Assemblies have been developed using the Endeavour Energy Construction Standards. Continually striving to improve our systems we have utilised feedback from workers in the field to make our assemblies most efficient and effective way of supplying hardware to contractors to meet their projects needs.
Summit Power assemblies take into consideration project specific information and are designed to include all variables such as Pole Size & Type, Conductor Type, Connections, Terminations & Circuit Information.
Construction Type |
Drawing No. |
Construction Description |
---|---|---|
B01 | EN332012 | LV B01 Bare Pin Through Mains Assy |
B02 | EN332013 | LV B02 Bare Through Mains Doubleย Arm Assy |
B03 | EN332014 | LV B03 Bare Through Strain Assy |
B04 | EN332015 | LV B04 Bare Through Strain Double Arm Assy |
B05 | EN332016 | LV B05 Bare Termination Assy |
B06 | EN332017 | LV B06 Bare Termination Double Arm Assy |