Summit Power Assemblies for the Endeavour Energy Network have been put together using the Endeavour Energy Construction Standards.
All items supplied in our Assemblies are from the Endeavour Energy Approved Material List.
Summit Power Assemblies include all items necessary for building constructions on the Endeavour Energy Network.
Our Assemblies have been developed using the Endeavour Energy Construction Standards. Continually striving to improve our systems we have utilised feedback from workers in the field to make our assemblies most efficient and effective way of supplying hardware to contractors to meet their projects needs.
Summit Power assemblies take into consideration project specific information and are designed to include all variables such as Pole Size & Type, Conductor Type, Connections, Terminations & Circuit Information.
Construction Type |
Drawing No. |
Construction Description |
---|---|---|
A01-95 | EN332006-95 | LV 95mmย ABCย A01 Through Suspension Assy (Max Deviation 25 Deg) |
A01-150 | EN332006-150 | LV 150mm ABC A01 Through Suspension Assy (Max Deviation 25 Deg) |
A02-95 | EN332007-95 | LV 95mm ABC A02 Through Suspension Assy (Max Deviation 25-45 Deg) |
A02-150 | EN332007-150 | LV 150mm ABC A02 Through Suspension Assy (Max Deviation 25-45 Deg) |
A03 | EN332008 | LVย ABC A03 Through Strain Assy |
A05 | EN332009 | LVย ABC A05 Termination Assy |