• 1800 648 070
  • This email address is being protected from spambots. You need JavaScript enabled to view it.

CCT

Summit Power Assemblies for the Ausgrid Energy Network have been put together using the Ausgrid Energy Construction Standards.

All items supplied in our Assemblies are from the Ausgrid Energy Approved Material List.

Summit Power Assemblies include all items necessary for building constructions on the Ausgrid Energy Network.

Our Assemblies have been developed using the Ausgrid Energy Construction Standards. Continually striving to improve our systems we have utilised feedback from workers in the field to make our assemblies most efficient and effective way of supplying hardware to contractors to meet their projects needs.

Summit Power assemblies take into consideration project specific information and are designed to include all variables such as Pole Size & Type, Conductor Type, Connections, Terminations & Circuit Information.
Ausgrid Assemblies - CCT High Constructor Voltage Assemblies
Construction Type
Drawing No/Summit Ref.
Construction Description
Const 2-1 CCTย  174956 11kV CCT Horizontal Pin Assy
Const 2-2 CCT 174957 11kV CCT Offset Arm Assy
Const 2-5 CCT 174958 11kV CCT Small Delta Assy
Const 2-6 CCT 174959 11kV CCT Delta Assy
Const 2-7 CCTย  174960 11kV CCT Large Delta Assy
Const 2-10 CCT 174961 11kV CCT Large Delta Assy
Const 2-11 CCT 174962 11kV CCT Through Termination Assy
Const 2-12 CCT 174963 11kV CCT Corner Pole Termination Assy
Const 2-14 CCT 174964 11kV Tee Off Assy
Const 2-30 CCT 174965 11kV Large Through Delta Termination Assyย 
Const 2-31 CCT 174966 11kV Large Delta Corner Assy
Const 2-37CCT 174967 11kV Large Through Delta Termination with Tee Off Assy
Const 2-38 CCT 174968 11kV Large Delta With Tee Off Assy